No Result
View All Result
Saturday, August 29, 2026
MM News
اردو
  • Home
  • Latest News
  • National
  • Crime
  • Opinions
  • The Other Side
MM News
  • Home
  • Latest News
  • National
  • Crime
  • Opinions
  • The Other Side
No Result
View All Result
No Result
View All Result
MM News
اردو
  • Latest
  • National
  • Crime
  • Opinions
  • The Other Side-Pakistan
Home Uncategorized

World Bank appreciates work on Tarbela dam’s extension project

Kumail Soomro by Kumail Soomro
October 31, 2019
Reading Time: 2 mins read
world bank president
ISLAMABAD: World Bank President David R Malpass along with Federal Minister Water Resources Faisal Vawda visited Tarbela Dam project on Thursday. 
Federal Secretary Water Resources Muhammad Ashraf, WAPDA Chairman Lt Gen Muzammil Hussain (Retd) and World Bank senior officials accompanied him during the visit.
The president also visited the main dam and the power house of Tarbela fourth extension hydropower project.
Speaking on the occasion, World Bank President expressed his pleasure over completion of Tarbela fourth extension hydropower project within time and less than estimated cost, adding that the work on the project is impressive.
He appreciated the efforts of Ministry of Water Resources for resolving the issues in relation to completion of Dassu hydro power project, construction of dams and other related projects.
The World Bank’s team especially recognised the untiring efforts of Faisal Vawda for effectively coping with the challenges related to water issues in Pakistan.
Earlier, the federal minister thanked the World Bank for the cooperation it has been providing to Pakistan for harnessing water and hydropower resources since 1960. He hoped that this cooperation will further enhance for implementation of various projects.
Vawda said the government is taking comprehensive and effective measures for improvement of water resources and construction of dams in Pakistan.
Pakistan will witness more progress in hydropower and water sectors with cooperation of Water Bank in future, he added.
He said 523 billion units of electricity have been contributed by Tarbela hydel power station to the national grid.
WAPDA Chairman commended that the World Bank helped broker Indus Water Treaty between Pakistan and India but also administered the entire financial arrangements to complete Indus Basin Replacement Works. 
This included two mega dams namely Mangla and Tarbela, five barrages and nine inter-river link canals to divert water from the western to the eastern rivers.
He also appreciated the World Bank for financial support for Tarbela fourth extension hydropower project, Dasu hydropower project and upcoming Tarbela fifth extension hydropower project.
WAPDA is looking forward to World Bank’s support for other projects, located on Indus cascade. These projects have the great potential to store water and generate phenomenal hydel electricity, he further said.
Briefing the World Bank President about the benefits of Tarbela Dam project, the chairman said that as many as 378 MAF water has been released from Tarbela reservoir to meet irrigation needs of the country.
In addition, Tarbela fourth extension hydropower project, commissioned last year, has also generated 5.6 billion units – more than the generation envisaged in PC-I of the project.
ADVERTISEMENT
Tags: damDavid R MalpassFaisal Vawdahydropowerpresidenttarbelaworld bank
ShareTweetSendShare
Previous Post

Pakistan rejects bifurcation of IoK into two union territories: FO

Next Post

CM orders transporting train victims bodies back to Sindh

Related Stories

Uncategorized

Gujarat’s 4-year-old Noor Fatima raped and murdered in Karim Dad

August 28, 2026
Uncategorized

FIA detects Rs3.2 million work visa fraud

August 27, 2026
Uncategorized

Embezzlement in Data Darbar donations revealed

August 27, 2026
Uncategorized

NRL returns to profit with Rs6.16 billion earnings in FY2025-26

August 27, 2026
Next Post
The decision was taken to control expenses. Source: FILE.

CM orders transporting train victims bodies back to Sindh

Latest

KP, Punjab issue alerts for heavy rain, flooding, landslides until Sept 5

9 hours ago

Mobile package prices surge up to 22% in a year: PTA

9 hours ago

5-year-old girl crushed to death by Suthra Punjab vehicle

10 hours ago

Missing baby case takes new turn after Karachi hospital denies birth

11 hours ago

Karachi tops Pakistan in flour prices at Rs3,200 per 20kg

12 hours ago

Multan man shoots wife dead at her parents’ home

13 hours ago

HEC warns public against fake attestation agents

13 hours ago

KE planned power shutdown schedule for Saturday August 29

13 hours ago

Latest

KP, Punjab issue alerts for heavy rain, flooding, landslides until Sept 5

9 hours ago

Mobile package prices surge up to 22% in a year: PTA

9 hours ago

5-year-old girl crushed to death by Suthra Punjab vehicle

10 hours ago

Missing baby case takes new turn after Karachi hospital denies birth

11 hours ago

Karachi tops Pakistan in flour prices at Rs3,200 per 20kg

12 hours ago

Multan man shoots wife dead at her parents’ home

13 hours ago

MM Digital (Pvt.) Ltd.

MM News is a subsidiary of the MM Group of Companies. It was established in 2019 with the aim of providing people of Pakistan access to unbiased information. Contact Details: 03200201537

Quick Links

  • Home
  • Advertise
  • MM News Urdu
  • The Other Side-Pakistan
  • Contact Us
  • Privacy Policy

Top Pages

  • Latest News
  • Showbiz
  • OP-ED
  • Technology
No Result
View All Result
  • Latest News
  • National
  • Crime
  • Opinions

© Copyright 2024 MMNews - All Rights Reserved.