No Result
View All Result
Friday, August 28, 2026
MM News
اردو
  • Home
  • Latest News
  • National
  • Crime
  • Opinions
  • The Other Side
MM News
  • Home
  • Latest News
  • National
  • Crime
  • Opinions
  • The Other Side
No Result
View All Result
No Result
View All Result
MM News
اردو
  • Latest
  • National
  • Crime
  • Opinions
  • The Other Side-Pakistan
Home Uncategorized

Karachi students develop machine to generate cheap electricity

MM News Staff by MM News Staff
January 24, 2021
Reading Time: 2 mins read

A group of students from Karachi have developed a machine to generate cheap electricity from flowing water which can help solve the power crisis in the country.

The students of Usman Institute of Technology, after months of hard work have completed the project called ‘Burak’ which can generate up to 1 kW of electricity. The machine can also be used on rivers, streams or canals to generate electricity.

While talking to MM News, Saad Sarmad Sattar, a student of the university, said that they have designed Project Burak to generate electricity with minimum flow of water.

ADVERTISEMENT

He said hydel power projects and electricity generation in Pakistan is only confined to extent of dams.  “Dams are very expensive and take years to build. The turbine used in our project starts rotating using the water of any stream and generates electricity,” he said. “Along with rivers, our power generation turbines can be used in villages with irrigation systems”.

Malik Mohammad Ali, another student working on the project, said they took it to Hub River for testing and have also tested it in the Lyari River. He said their experiment was successful in both locations and the project generated electricity.

Another student, Safeer Ahmad Khan, said that the purpose of creating the Burak project was to make people self-sufficient in electricity generation. He said project maintenance costs will be zero and there is no waste production.

Muhammad Ali said that it took us six months to prepare the project, while Saad revealed they spend Rs. 150,000 on the project. Safeer Khan said that all the expenses incurred will be recovered within 17 to 18 months after which the electricity generated would be free. He said the costs can be reduced significantly if it is developed on a commercial basis.

Dr Abdul Qadir, who was supervising the project, said that the most important part of Burak is its turbine. He said the students have designed this project keeping in mind the target of 1 KW at the time of preparation.

“If it is placed in any flowing water, it will generate electricity. Electricity consumers will be independent in every way. You will not have to depend on anyone for power supply,” he said.

Tags: cheapElectricityKarachistudents
ShareTweetSendShare
Previous Post

Pakistan announces 17-member squad for first Test against South Africa

Next Post

Two TTP commanders among five terrorists killed in North Waziristan operation

Related Stories

Uncategorized

Gujarat’s 4-year-old Noor Fatima raped and murdered in Karim Dad

August 28, 2026
Uncategorized

FIA detects Rs3.2 million work visa fraud

August 27, 2026
Uncategorized

Embezzlement in Data Darbar donations revealed

August 27, 2026
Uncategorized

NRL returns to profit with Rs6.16 billion earnings in FY2025-26

August 27, 2026
Next Post

Two TTP commanders among five terrorists killed in North Waziristan operation

Latest

Karachi tops Pakistan in flour prices at Rs3,200 per 20kg

3 hours ago

Multan man shoots wife dead at her parents’ home

4 hours ago

HEC warns public against fake attestation agents

4 hours ago

KE planned power shutdown schedule for Saturday August 29

5 hours ago

KP to launch merit-based EV bike scheme for women

5 hours ago

Govt announces Rs5 million for families of PIMS fire victims

5 hours ago

Barrister Iftikhar Gillani elected new PM of Azad Jammu and Kashmir

6 hours ago

KSE-100 gains nearly 400 points

6 hours ago

Latest

Karachi tops Pakistan in flour prices at Rs3,200 per 20kg

3 hours ago

Multan man shoots wife dead at her parents’ home

4 hours ago

HEC warns public against fake attestation agents

4 hours ago

KE planned power shutdown schedule for Saturday August 29

5 hours ago

KP to launch merit-based EV bike scheme for women

5 hours ago

Govt announces Rs5 million for families of PIMS fire victims

5 hours ago

MM Digital (Pvt.) Ltd.

MM News is a subsidiary of the MM Group of Companies. It was established in 2019 with the aim of providing people of Pakistan access to unbiased information. Contact Details: 03200201537

Quick Links

  • Home
  • Advertise
  • MM News Urdu
  • The Other Side-Pakistan
  • Contact Us
  • Privacy Policy

Top Pages

  • Latest News
  • Showbiz
  • OP-ED
  • Technology
No Result
View All Result
  • Latest News
  • National
  • Crime
  • Opinions

© Copyright 2024 MMNews - All Rights Reserved.