No Result
View All Result
Saturday, August 29, 2026
MM News
اردو
  • Home
  • Latest News
  • National
  • Crime
  • Opinions
  • The Other Side
MM News
  • Home
  • Latest News
  • National
  • Crime
  • Opinions
  • The Other Side
No Result
View All Result
No Result
View All Result
MM News
اردو
  • Latest
  • National
  • Crime
  • Opinions
  • The Other Side-Pakistan
Home Uncategorized

KCR resumption delayed over lack of arrangements

MM News Staff by MM News Staff
November 14, 2020
Reading Time: 2 mins read

KARACHI: The resumption of Karachi Circular Railway (KCR) has now been delayed the lack of arrangements and will now commence from November 19.

Earlier this week, the Pakistan Railways had announced to partially resume the KCR from November 16 in phases. However, the 14-km long track from City Station to Orangi Town remains unclear while the station also lacks basic facilities.

The road crossing in Gulbai and other areas has become a complicated issue in the resumption of KCR and traffic has to be stopped temporarily at crossing points with ropes rather than a railway crossing.

ADVERTISEMENT

On Thursday, a KCR train comprising four bogies and two locomotives from City Railway Station to Orangi Town. However, the train took around two hours to cover the entire distance that is supposed to take minutes, due to the dilapidated condition of the tracks and stations.

The KCR project is 12.63 kilometres at grade (on the ground), and 30.75 kilometres elevated with 24 railway stations. The average distance between each station will be 1.8Km. The train traveled at 30km/h from the City railway station to Orangi Town. The spokesperson said trains will run at 50 to 55km/h.

Pakistan Railways has announced that it will partially resume the service from November 16. Four trains will leave from Landhi and four from Orangi town in the first phase. They will depart at 7am, 10am, 1pm and 4pm and will cost Rs50 per journey.

The project’s complete track will start from Drigh Road station, going through Gulistan-e-Jauhar and heading to Gulshan-e-Iqbal. It will turn towards Nazimabad going through Yaseenabad and Liaqatabad.

The track then heads to Manghopir and SITE before going taking a turn towards Baldia and going through Lyari, Mereweather Tower, City Station and onward to PIDC and Karachi Cantt.

The KCR would run parallel to Sharah-e-Faisal and pass through Chanesar Goth, Shaheed-e-Millat, and Karsaz before completing a round trip at the Drigh Road station.

Tags: KarachiKCRresumptiontrain
ShareTweetSendShare
Previous Post

World Diabetes Day 2020 being observed today

Next Post

Land mafia groups illegally occupying lands in Islamabad

Related Stories

Uncategorized

Gujarat’s 4-year-old Noor Fatima raped and murdered in Karim Dad

August 28, 2026
Uncategorized

FIA detects Rs3.2 million work visa fraud

August 27, 2026
Uncategorized

Embezzlement in Data Darbar donations revealed

August 27, 2026
Uncategorized

NRL returns to profit with Rs6.16 billion earnings in FY2025-26

August 27, 2026
Next Post

Land mafia groups illegally occupying lands in Islamabad

Latest

PM Sharif ‘receives’ inquiry report into PIMS fire tragedy

2 hours ago

Gujrat’s 4-year-old Noor Fatima raped, killed by cousin

3 hours ago

Flour rates continue to rise across Pakistan

3 hours ago

BLA bid o use minor girls for suicide attack foiled in Makran

4 hours ago

Gold prices plunge Rs15,100 per tola, silver also declines

4 hours ago

Karachi DHA brawl: New footage shows woman attacking neighbour

5 hours ago

Rakhi Sawant mobbed while distributing Janamaz in Mecca

5 hours ago

Punjab Bar Council backs creation of new provinces

5 hours ago

Latest

PM Sharif ‘receives’ inquiry report into PIMS fire tragedy

2 hours ago

Gujrat’s 4-year-old Noor Fatima raped, killed by cousin

3 hours ago

Flour rates continue to rise across Pakistan

3 hours ago

BLA bid o use minor girls for suicide attack foiled in Makran

4 hours ago

Gold prices plunge Rs15,100 per tola, silver also declines

4 hours ago

Karachi DHA brawl: New footage shows woman attacking neighbour

5 hours ago

MM Digital (Pvt.) Ltd.

MM News is a subsidiary of the MM Group of Companies. It was established in 2019 with the aim of providing people of Pakistan access to unbiased information. Contact Details: 03200201537

Quick Links

  • Home
  • Advertise
  • MM News Urdu
  • The Other Side-Pakistan
  • Contact Us
  • Privacy Policy

Top Pages

  • Latest News
  • Showbiz
  • OP-ED
  • Technology
No Result
View All Result
  • Latest News
  • National
  • Crime
  • Opinions

© Copyright 2024 MMNews - All Rights Reserved.