No Result
View All Result
Sunday, August 30, 2026
MM News
اردو
  • Home
  • Latest News
  • National
  • Crime
  • Opinions
  • The Other Side
MM News
  • Home
  • Latest News
  • National
  • Crime
  • Opinions
  • The Other Side
No Result
View All Result
No Result
View All Result
MM News
اردو
  • Latest
  • National
  • Crime
  • Opinions
  • The Other Side-Pakistan
Home Technology

China, Pakistan complete nuclear technology experiment in Karachi

MM News Staff by MM News Staff
September 7, 2020
Reading Time: 2 mins read

KARACHI: China and Pakistan have completed an advanced nuclear technology experiment at the Karachi Nuclear Power Plant (KANUPP).

China National Nuclear Corporation (CNNC) completed the Hot Functional Tests (HFTs) at the 1100 MW K2 unit in Karachi. KANUPP’s K2 is based on Hualong One technology, China’s indigenous pressurized water nuclear reactor design that is going to be the mainstream nuclear technology in the years to come. 

According to the official statement from CNNC, the successful HFTs will allow CNNC to initiate subsequent major processes at the K2 including nuclear fuel loading and grid-connected power generation.

The HFTs play a significant role in the construction of the nuclear power project, simulating the actual operating conditions of the nuclear power plant to verify the reliability of the main equipment and systems under the thermal conditions before the nuclear reactor is loaded with nuclear fuel.

CNNC is building two 1100 MW Hualong One reactors at KANUPP; K2 and K3. The construction of K2 and K3 reactors had started in 2015 and 2016 respectively. CNNC had installed the Hualong One reactors’ internals at K2 and K3 in January 2019 and April 2020 respectively. K2 will become operational next year while K3 a year later.

Both K2 and K3 units will have a design life of 60 years and account for 10% of Pakistan’s total power generation capacity. 

Besides Karachi, CNNC is constructing 2 Hualong One reactors each in China at Fuqing Nuclear Power Plant in Fujian and Fangchenggang Nuclear Power Plant in Guangxi. Whereas, 1 Hualong One reactor each is being built at Zhangzhou Nuclear Power Plant in Fujian and Taipingling Nuclear Power Plant in Guangdong.

Moreover, China General Nuclear (CGN) is also constructing 4 Hualong One reactors in China. The country is aiming to increase its presence in the nuclear power sector around the world. It hopes to construct Hualong One reactors in South America and England in the years to come.

China developed the Hualong One reactor to rival US-made AP1000 and European-made Evolutionary Pressurized Reactor. Hualong One reactor is better than both of the US and European-made reactors in terms of technology and cost.

ADVERTISEMENT
Tags: GuangxiKarachi Nuclear Power Plant (KANUPP)MM groupmm newsmm tvNuclear Power Plant
ShareTweetSendShare
Previous Post

Nawaz Sharif’s former principal secretary indicted in assets case

Next Post

IHC issues stay order on Cynthia Ritchie’s deportation

Related Stories

Technology

AI could replace millions of jobs, Nobel Laureate Geoffrey Hinton warns

August 17, 2026
Technology

Google allows users to remove watermarks from Gemini-generated images

August 16, 2026
Technology

Google study shows Bitcoin’s cryptography could fall in minutes, not decades

August 16, 2026
Technology

How to recover a WhatsApp account after hack?

August 15, 2026
Next Post

IHC issues stay order on Cynthia Ritchie's deportation

Latest

Pakistan makes record Rs1.2 trillion early repayment of debt

7 hours ago

PM Shehbaz approves immediate suspension of eight officials over PIMS fire

7 hours ago

Karachi robbery: CCTV shows citizen knocking down suspect with motorcycle

8 hours ago

Karachi apartment assault case: Probe launched into police officers seen in CCTV footage

8 hours ago

Gul Plaza fire: Report blames safety lapses, delays and institutional failures

9 hours ago

K-Electric issues August 30 maintenance shutdown schedule

10 hours ago

Wasim Akram opens up about Shaniera’s decision not to join him for Hajj

10 hours ago

UK prostate cancer cases surge by more than 100,000

10 hours ago

Latest

Pakistan makes record Rs1.2 trillion early repayment of debt

7 hours ago

PM Shehbaz approves immediate suspension of eight officials over PIMS fire

7 hours ago

Karachi robbery: CCTV shows citizen knocking down suspect with motorcycle

8 hours ago

Karachi apartment assault case: Probe launched into police officers seen in CCTV footage

8 hours ago

Gul Plaza fire: Report blames safety lapses, delays and institutional failures

9 hours ago

K-Electric issues August 30 maintenance shutdown schedule

10 hours ago

MM Digital (Pvt.) Ltd.

MM News is a subsidiary of the MM Group of Companies. It was established in 2019 with the aim of providing people of Pakistan access to unbiased information. Contact Details: 03200201537

Quick Links

  • Home
  • Advertise
  • MM News Urdu
  • The Other Side-Pakistan
  • Contact Us
  • Privacy Policy

Top Pages

  • Latest News
  • Showbiz
  • OP-ED
  • Technology
No Result
View All Result
  • Latest News
  • National
  • Crime
  • Opinions

© Copyright 2024 MMNews - All Rights Reserved.